Footbridge Steelwork Preparation and Coating

February 21, 2024

Our Site Services operatives expertly completed shot blasting surface preparation followed by specialist protective industrial coatings to steelwork destined for the East Riding of Yorkshire.

Teams were asked to prepare and protect steelwork for a bridge in the rail industry. Meticulous preparation and expertise were needed to protect the steelwork from external conditions that can cause corrosion and degradation of the steels if precautions aren’t taken; protecting its longevity and structural integrity.

The steelworks were due to be installed on an existing footbridge that required an extension.

Read more on this Powertherm project here >>